Insights · Building BlockGenie OS · Part 2
A contact isn’t just a name
August 2026: the build starts with the records people rely on.
The first entry in the code is from 2 August. It says “Build Contacts Core foundation”. There was nothing glamorous about it. I wanted us to stop entering the same information in four places, and I needed somewhere to start. Within three days we were testing contact changes on a small pilot, with a way to review them and undo them.
The difficulty was that a contact isn’t just a name and an email address. Someone can live in one flat and own another. A resident may be able to let a plumber in without having any authority to approve the work. We needed to know what connected someone to a building, and what that connection meant for the job in front of us. A list of people wouldn't do that.
Even the early test version separated proposing a change from approving it. One person could look into a discrepancy, attach the evidence and suggest a correction. Someone else could check it before it changed the main record, and the approval was saved with its history. We tested with made-up records. I wanted to find out what happened when we got it wrong without getting it wrong for a resident.
More than contacts
Contacts were where I started, but August was really about the foundations everything else would use: mail, documents and the calendar. If an enquiry turns into a management appointment, the meetings and correspondence shouldn't disappear into a different bit of software. If a report arrives during a handover, somebody looking at a repair later should be able to find it. Those foundations have been reworked throughout the build, because every new use for them exposes something we hadn't thought through.
By 4 August I was already sketching the journey from enquiry to quote, contract and, in the words I wrote at the time, “welcoming them to the MYFM family” (we hadn't become BlockGenie yet). I was also outlining a jobs board where approved contractors could ask questions and submit quotes. Neither was a finished feature. But within a couple of days I was writing down how I wanted the business to work, not just designing another place to keep a list of contacts.
Starting with what we know
By the end of August we had early pilot work, fixes coming out of testing and a simpler buildings register taking shape. We were also dropping the idea that taking on a building had to start with a complete handover pack. A new building rarely arrives with every document, date and contact in order. The system needed to let us start with what we knew, keep track of the gaps and add the rest as it arrived.
The job for September was to turn those ideas into a plan: what we needed to build ourselves, what we could connect to, and how we'd know any of it was ready.
Want a building that remembers?
Tell us about your building. We aim to give a meaningful reply within one working day.
UKALA member · Client money protected · Property Redress Scheme
